Award Workflow

Procedure Workflow for 1 Submitted Bid

Award Section

digraph G {
    subgraph cluster_1 {
        node [style=filled, fillcolor=seashell2];
        edge[style=dashed,  arrowhead="vee", label="*"];
        "pending" -> "active";
        node [style=filled, fillcolor=white];

        edge[style=dashed,  arrowhead="vee",  label="**", constraint=false];
        "pending" -> "unsuccessful";
        edge[style=solid,  arrowhead="vee", label="~", constraint=false];
        "active" -> "unsuccessful";
        label = "Awarding Process";
        color=white
        {rank=same; "active" "unsuccessful"}
    }
}

Legend

* protocol is uploaded and award is switched to active by the organizer.

** organizer has decided to disqualify the bidder.

~ organizer switched contract to cancelled.

Roles


Chronograph:solid
Organizer:dashed

Contract Section

digraph G {
    subgraph cluster_1 {
        node [style=filled, fillcolor=seashell2];
        edge[style=dashed,  arrowhead="vee", label="*"];
        "pending" -> "acive";
        label = "Contract Workflow";
        color=white
    }
    edge[style=dashed,  arrowhead="vee",  label="**"];
    "pending" -> "cancelled";
}

Legend

* document was uploaded to contract. The contract itself was successfully activated by the organizer.

** there was no document uploaded. The organizer refused to activate the contract.

Roles

Chronograph:solid
Organizer:dashed

Procedure Description

  1. The procedure receives active.qualification status.

  2. The award with the qualifying bid initially receives pending status.The process enters the verificationPeriod with the auto-generated duration of 0-6 business days. During this term the organizer uploads the protocol (documentType: auctionProtocol) first and manually switches award to active status then. Simultaneously the awarding process enters the signingPeriod phase and the procedure receives active.awarded status.

    2.1 If the organizer decides to disqualify the bidder, a document (documentType: rejectionProtocol or act) has to be uploaded first and the award has to be manually switched to unsuccessful then.

  3. When the qualification procedure enters the signingPeriod stage, which lasts up to 20 days from the beginning of the bidder qualification process. The contract of the qualifying bid initially receives a pending status. Within this time, the organizer should upload the document (documentType: contractSigned) in the system and manually switch contract to active status in order to successfully finish the qualification procedure.

    3.1 For the bidder to be disqualified a document (documentType: rejectionProtocol or act) has to be uploaded first and the contract has to be manually switched to cancelled by the organizer then. When all of the actions are done, award will receive unsuccessful status.

Procedure Workflow for 2 Submitted Bids or More

Award Section

digraph G {
    subgraph cluster_1 {
        node [style=filled, fillcolor=lightblue];
        edge[style=dotted,  arrowhead="vee"];
        "pending.waiting" -> cancelled[label="2nd award only" fontcolor=blue];
        label = "Awarding Process";
        color=white
    }
    subgraph cluster_2 {
        node [style=filled, fillcolor=seashell2];
        edge[label="**", style=dashed,  arrowhead="vee"];
        "pending" -> "active";
        edge[label="*", style=solid,  arrowhead="vee"];
        "pending.waiting" -> "pending";
        node [style=filled, fillcolor=white];
        edge[label="***", style=dashed,  arrowhead="vee"];
        "pending" -> unsuccessful;
        edge[label="~", style=solid,  arrowhead="vee"];
        "active" -> unsuccessful;
        color=white
        {rank=same; "pending" "unsuccessful" "cancelled"}
    }
}

Legend

Blue nodes represent statuses for the 2nd award ONLY

* award for winner is always formed in pending.

** protocol is uploaded and award is switched to active by the organizer.

*** organizer has decided to disqualify the bidder.

~ organizer switched contract to cancelled.

Roles

Chronograph:solid
Organizer:dashed
Participant:dotted

Contract Section

digraph G {
    subgraph cluster_1 {
        node [style=filled, fillcolor=seashell2];
        edge[style=dashed,  arrowhead="vee", label="*"];
        "pending" -> "acive";
        label = "Contract Workflow";
        color=white
    }
    edge[style=dashed,  arrowhead="vee",  label="**"];
    "pending" -> "cancelled";
}

Legend

* document was uploaded to contract. The contract itself was successfully activated by the organizer.

** there was no document uploaded. The organizer refused to activate the contract.

Roles

Chronograph:solid
Organizer:dashed

Procedure Description

  1. The procedure receives active.qualification status.

  2. The award with the highest qualifying bid initially receives pending status. The process enters the verificationPeriod with the auto-generated duration of 0-6 business days. During this term the organizer uploads the protocol (documentType: auctionProtocol) first and manually switches award to active status then. Simultaneously the procedure enters the signingPeriod phase and the procedure receives active.awarded status.

    2.1 If the organizer decides to disqualify the bidder, a document (documentType: rejectionProtocol or act) has to be uploaded first and the award has to be manually switched to unsuccessful then.

3. When the qualification procedure enters the signingPeriod stage, which lasts up to 20 days from the beginning of the bidder qualification process. The contract of the qualifying bid initially receives a pending status. Within this time, the organizer should upload the document (documentType: contractSigned) in the system and manually switch contract to active status in order to successfully finish the qualification procedure.

3.1 For the bidder to be disqualified a document (documentType: rejectionProtocol or act) has to be uploaded first and the contract has to be manually switched to cancelled by the organizer then. As long as such an action is done, award status will receive unsuccessful.
  1. The second highest qualifying bidder, immediately after the auction ending receives the pending.waiting status, in which by default they agree to wait for the end of the qualification of the highest qualifying bidder to be eligible to go through the qualification process if the highest bidder is disqualified. The only action that they can make is to manually cancel the award decision (switch award to cancelled status) - withdraw the security deposit and lose the chance to become a winner of the auction. If that is done and the first highest qualifying bidder becomes unsuccessful, the procedure receives the unsuccessful status. Provided that first award gets disqualified while the second has not disqualified themselves, the second award automatically changes its status from pending.waiting to pending, after which they undergo the same qualification procedure as outlined above for the first award.

Notes

  1. The auto-generated period duration does not influence the actions which can be done.
  2. The organizer can disqualify the award at any stage of the awarding process up to the moment, when a document with the documentType: contractSigned has been uploaded.
  3. The second highest qualifying bidder can disqualify themselves at any point in time BEFORE the start of their qualification process.

Statuses

pending:
Award:Awaiting for the protocol to be uploaded and confirmed by the organizer. The valid bidder is able to submit the protocol as well, although it is not sufficient to move to the next status.
Contract:Awaiting for the contract to be signed (uploaded and activated in the system by the organizer).
active:
Award:Auction protocol (documentType: auctionProtocol) was uploaded so that the award could be switched to active by the organizer.
Contract:The document (documentType: contractSigned) was uploaded so that the status of the contract object could be switched to active by the organizer.
unsuccessful:

Terminal status of award. Rejection protocol or act (documentType: rejectionProtocol/act) was uploaded so that the award could be switched to unsuccessful by the organizer. Or when the contract becomes status cancelled, the status of the award will be unsuccessful.

cancelled:

Terminal status of contract. Rejection protocol or act (documentType: rejectionProtocol/act) was uploaded so that the contract could be switched to cancelled by the organizer.